|
|
Rank | Posts | Team |
International Star | 2016 | No Team Selected |
Joined | Service | Reputation |
Aug 2010 | 14 years | |
Online | Last Post | Last Page |
Jun 2013 | Jun 2013 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| i noticed a JCB and a pile of earth
|
|
|
Rank | Posts | Team |
Player Coach | 1452 | No Team Selected |
Joined | Service | Reputation |
Jul 2009 | 16 years | |
Online | Last Post | Last Page |
Oct 2014 | Oct 2014 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
|
|
|
|
|
Rank | Posts | Team |
Player Coach | 819 | No Team Selected |
Joined | Service | Reputation |
Dec 2008 | 16 years | |
Online | Last Post | Last Page |
May 2017 | May 2017 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote ="Roverswall"If the AUD was so strong and the GBP so weak they would be around 1-1 , That isn't the case.
Recovered, Decent, yes.
Killing, no.'"
Clearly you have never been to Australia!!! Or out of old bilighty for that matter. I'll refrain from putting any face symbol on this.
|
|
|
Rank | Posts | Team |
Player Coach | 2464 | No Team Selected |
Joined | Service | Reputation |
Feb 2010 | 15 years | |
Online | Last Post | Last Page |
Oct 2011 | Jul 2011 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote ="LincolnDEVILSFan"Clearly you have never been to Australia!!! Or out of old bilighty for that matter. I'll refrain from putting any face symbol on this.'"
I actually don't think there is a smiley available on here that would even come close to representing his stupidness.
Thats possibly the closest one.
|
|
|
Rank | Posts | Team |
Player Coach | 3495 | No Team Selected |
Joined | Service | Reputation |
Aug 2006 | 18 years | |
Online | Last Post | Last Page |
Dec 2014 | Dec 2014 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote ="Inflatable_Armadillo"It will just be a programming decision in respect of maintaining the best critical path. This is the main stand and therefore has the most fit-out work required when they top-out. So topping out on the main stand first gets the follow-on subbies into the building and away, then the steel subbie can move onto the to erecting the steel and pre-cast terrace units for the rest of the stadium. It is usual for the steel subbie to erect the pre-cast terrace units as part of their package and as they go, so this also makes the stand look more 'finished' than in reality it actual is, as this part of the stadium will probably take the same time as finishing off the rest of the ground.'"
Funny because looking at the photo's I saw little continutiy for most trades.
£25m stadium being built with one crane and one cherry picker?
Netting up on the roof but no cladders?
Sommat not right there.
And yes, I have worked on them.
Has go slow written all over it.
|
|
|
|
Rank | Posts | Team |
Player Coach | 4259 | No Team Selected |
Joined | Service | Reputation |
May 2007 | 18 years | |
Online | Last Post | Last Page |
Jan 2020 | Feb 2019 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote ="Alexs Dad"Funny because looking at the photo's I saw little continutiy for most trades.
£25m stadium being built with one crane and one cherry picker?
Netting up on the roof but no cladders?
Sommat not right there.
And yes, I have worked on them.
Has go slow written all over it.'"
These pictures have clearly been taken when the site is not working, either one evening or on a weekend. While the crane with the luffing jib is extended, along with cherry picker along side having it's basket parked at height, I don't think you have noticed the 50/75 tonne parked alongside folded down, or at least the three other cherry pickers also folded down.
The nets are up for 80% of the roof but the roof steelwork still needs completing at both ends, most probably done that way for temporary stability reasons as cantilever stadium roofs need some thinking about when it comes to erection sequence. Unless the programme dictated it why would you let the roof cladders start until the nets were 100% complete? I also suspect they will want to start at one end and come one way. Also, they might not actual start on the roof cladding for quite some time yet. Roof cladding is a quick operation and the subbie might not want to do multiple visits or risk catching the steelwork up, a possibility! A large proportion of the metal deck is in and it looks like some of concreted already.
It just looks like a decent project, early in the programme, on the go to me!
|
|
|
Rank | Posts | Team |
Club Coach | 13180 | No Team Selected |
Joined | Service | Reputation |
Jan 2005 | 20 years | |
Online | Last Post | Last Page |
Dec 2013 | Dec 2013 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote ="Alexs Dad"Funny because looking at the photo's I saw little continutiy for most trades.
£25m stadium being built with one crane and one cherry picker?
Netting up on the roof but no cladders?
Sommat not right there.
And yes, I have worked on them.
Has go slow written all over it.'"
Mate you don't have a clue really do you, i work for one of the biggest construction firms in the country and this is how its done with every stadium using crane's and cherry pickers. Have you actually drove past the stadium on a week day? There's maybe 6 or 7 cherry pickers and normally 3 crane's working on there, when works finished the cherrys are stored at the back of the west stand, and the mobile crane's go back to the depot, theirs only one perminant heavy duty crane that is used for the lifting of the steel uprights and other heavy materials.
|
|
|
Rank | Posts | Team |
Moderator | 7760 | No Team Selected |
Joined | Service | Reputation |
Dec 2001 | 23 years | |
Online | Last Post | Last Page |
Apr 2018 | Oct 2016 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote ="Alexs Dad"Has go slow written all over it.'"
Yeah, massively slow, especially when you consider that it was just flat ground six weeks ago.
|
|
|
|
Rank | Posts | Team |
Player Coach | 9426 | No Team Selected |
Joined | Service | Reputation |
Jan 2009 | 16 years | |
Online | Last Post | Last Page |
Oct 2017 | Oct 2017 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Agreed, it looks like it's moved on every time I pass it on my way to and from work.
|
|
|
Rank | Posts | Team |
Player Coach | 2464 | No Team Selected |
Joined | Service | Reputation |
Feb 2010 | 15 years | |
Online | Last Post | Last Page |
Oct 2011 | Jul 2011 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote ="vikingsmurf"i noticed a JCB and a pile of earth
'"
I'm wondering how long it is before your signature gets removed??!
|
|
|
Rank | Posts | Team |
International Star | 2016 | No Team Selected |
Joined | Service | Reputation |
Aug 2010 | 14 years | |
Online | Last Post | Last Page |
Jun 2013 | Jun 2013 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote ="PHIPPS"I'm wondering how long it is before your signature gets removed??!
'"
its bloody good while it lasts though
|
|
|
|
Rank | Posts | Team |
Player Coach | 451 | No Team Selected |
Joined | Service | Reputation |
Jan 2007 | 18 years | |
Online | Last Post | Last Page |
Mar 2015 | Mar 2015 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote ="Roverswall"If the AUD was so strong and the GBP so weak they would be around 1-1 , That isn't the case.
Recovered, Decent, yes.
Killing, no.'"
Are you having a laugh!!! Before I go on I am a Brit living in Sydney.
The reason why the AUD has strengthen so much over the last three years is due to China. The resources sector over here are feeding China's never ending energy and raw material needs. In fact, I know of two things for certain as colleagues are in the know and work with clients in these sectors.
- The mining companies can not extract the raw material fast enough to meet China's demand.
- If you go to the Central coast (100km north of Sydney) you will see the longest cargo ship queue in the world (visable from google earth aswell. These are all empty Chinese cargo/coal ships waiting to go into Newcastle for their load. Newcastle Ports just can not fill up the damned things fast enough!! This is the same of all Ports around Australia.
In addition to this the reserve bank of Australia have kept interest rates low, and have historically not encouraged a debt society. Together with exports remaining high due to the growth of China this ensured that Aus did not go into reccession, and suffice to say that the Australian Dollar is now a major player in the world banking due to the strength of it.
When I got here in 2006, it was 3.04GBP to the dollar. Now it is 1.54, and I am loving sending all my spare AUD's back to pay off my UK motgage with my place in London. It is free money!!!
|
|
|
Rank | Posts | Team |
Club Coach | 7814 | No Team Selected |
Joined | Service | Reputation |
Apr 2005 | 20 years | |
Online | Last Post | Last Page |
Oct 2013 | Mar 2013 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| damn you.....
|
|
|
Rank | Posts | Team |
Player Coach | 336 | No Team Selected |
Joined | Service | Reputation |
Jul 2007 | 18 years | |
Online | Last Post | Last Page |
Jan 2015 | Jan 2015 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote ="Odemwingie"It's looking great, good to know it is actually being built.
Suppose if they put a pitch down they can move in as soon as that stand is built!'"
As the original photographs of the site were in sepia its about time.
Any new grounds in our sport are welcome and will look good when on TV. Hopefully they can find a way of filling the the stadium.
|
|
|
Rank | Posts | Team |
Player Coach | 4259 | No Team Selected |
Joined | Service | Reputation |
May 2007 | 18 years | |
Online | Last Post | Last Page |
Jan 2020 | Feb 2019 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote ="John S"As the original photographs of the site were in sepia its about time.
Any new grounds in our sport are welcome and will look good when on TV. Hopefully they can find a way of filling the the stadium.'"
...and it is not yet definitely going to be built... it has taken a big leap but now they need to get planning on Wheldon Road for a Superstore!
|
|
|
Rank | Posts | Team |
Player Coach | 3495 | No Team Selected |
Joined | Service | Reputation |
Aug 2006 | 18 years | |
Online | Last Post | Last Page |
Dec 2014 | Dec 2014 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote ="RED LEAGUE"Mate you don't have a clue really do you, i work for one of the biggest construction firms in the country and this is how its done with every stadium using crane's and cherry pickers. Have you actually drove past the stadium on a week day? There's maybe 6 or 7 cherry pickers and normally 3 crane's working on there, when works finished the cherrys are stored at the back of the west stand, and the mobile crane's go back to the depot, theirs only one perminant heavy duty crane that is used for the lifting of the steel uprights and other heavy materials.'"
Ooooh. Touchy. Are you one of these new fangled graduates who builds out of a book?
If we want to wave our construction cocks in the air then fine, lets get em out. I've been at it 22 years and worked on 3 stadia projects previously, tendered works on another couple and every one had the piling, groundworks, steel, terrace, cladding sequence following each other on each stand running consectivly and concurrently. We even had more than one big crane you know. Some of them had 2 or 3 100 tonne mobiles, on top of the boys toys and cherry pickers that get put away at night with Rolly Lofty and Scoop.
That stand looks like its steelwork is 95% complete, great progress. Whats the erectors doing now? Steel erectors don't want to be messing about with precast units, netting, and cladding. Yon mon before makes it sound like there's the same 6 blokes building the lot in sequence. You will know full well they fetch different subbies in for different tasks, the precast suppliers often carry out design and fix, the cladders are often different to the erectors, the netters will be someone else. Steel erectors want tonnage and the tonnage in that stand was completed weeks ago.
I'm sure if they tried they could build more than one at once, like Hull, Wire, Darlington, Shrewsbury, Leigh (I wont bore you why the Reebok had to be done like that)...especially as your groundworkers have been on there since December! 4 months later there is only steel in one of the stands. Thats 16 weeks. Hull was at PC within 48. When you're hammering it the groundworkers should be on GL20, erectors right up their backsides on GL15, precast on GL10, cladders on GL5, netters on 1.
If you can only build it one stand at once, fair enough, there may be good reason for it, but don't go all girly when someone points it out.
|
|
|
Rank | Posts | Team |
Player Coach | 3495 | No Team Selected |
Joined | Service | Reputation |
Aug 2006 | 18 years | |
Online | Last Post | Last Page |
Dec 2014 | Dec 2014 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Oh and while I'm at it, orange bunting and road pins is not suitable edge protection to excavations (which must be deep because there is a bloody ladder needed to get into them which is not fix and tied I might add) and would get condemned on one of my jobs.
|
|
|
Rank | Posts | Team |
Player Coach | 2233 | No Team Selected |
Joined | Service | Reputation |
Feb 2010 | 15 years | |
Online | Last Post | Last Page |
Oct 2013 | Oct 2013 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote ="Alexs Dad"Ooooh. Touchy. Are you one of these new fangled graduates who builds out of a book?'"
No, he's a bricklayer. True story.
|
|
|
Rank | Posts | Team |
Club Coach | 13180 | No Team Selected |
Joined | Service | Reputation |
Jan 2005 | 20 years | |
Online | Last Post | Last Page |
Dec 2013 | Dec 2013 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote ="Ian 77 Redux"No, he's a bricklayer. True story.'"
Good memory! Actually im a site agent now after 3 years of Uni and lots and lots of courses.
|
|
|
Rank | Posts | Team |
Player Coach | 2233 | No Team Selected |
Joined | Service | Reputation |
Feb 2010 | 15 years | |
Online | Last Post | Last Page |
Oct 2013 | Oct 2013 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote ="RED LEAGUE"Good memory! Actually im a site agent now after 3 years of Uni and lots and lots of courses.'"
Good for you pal (seriously, not trying to be funny on this occasion!).
|
|
|
Rank | Posts | Team |
Club Coach | 13180 | No Team Selected |
Joined | Service | Reputation |
Jan 2005 | 20 years | |
Online | Last Post | Last Page |
Dec 2013 | Dec 2013 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote ="Alexs Dad"Ooooh. Touchy. Are you one of these new fangled graduates who builds out of a book?
If we want to wave our construction cocks in the air then fine, lets get em out. I've been at it 22 years and worked on 3 stadia projects previously, tendered works on another couple and every one had the piling, groundworks, steel, terrace, cladding sequence following each other on each stand running consectivly and concurrently. We even had more than one big crane you know. Some of them had 2 or 3 100 tonne mobiles, on top of the boys toys and cherry pickers that get put away at night with Rolly Lofty and Scoop.
That stand looks like its steelwork is 95% complete, great progress. Whats the erectors doing now? Steel erectors don't want to be messing about with precast units, netting, and cladding. Yon mon before makes it sound like there's the same 6 blokes building the lot in sequence. You will know full well they fetch different subbies in for different tasks, the precast suppliers often carry out design and fix, the cladders are often different to the erectors, the netters will be someone else. Steel erectors want tonnage and the tonnage in that stand was completed weeks ago.
I'm sure if they tried they could build more than one at once, like Hull, Wire, Darlington, Shrewsbury, Leigh (I wont bore you why the Reebok had to be done like that)...especially as your groundworkers have been on there since December! 4 months later there is only steel in one of the stands. Thats 16 weeks. Hull was at PC within 48. When you're hammering it the groundworkers should be on GL20, erectors right up their backsides on GL15, precast on GL10, cladders on GL5, netters on 1.
If you can only build it one stand at once, fair enough, there may be good reason for it, but don't go all girly when someone points it out.'"
I get what your saying pal, but not every stadium is built in a 1, 2, 3, sequance like youv'e said Hull and Leigh's were, theres different ways of doing the job. By the looks of it Buckinghams have took a leaf out of the German construction industry's book by fixing whole steel uprights with roof trusses conected along with concrete terracing going in all at once in a precast section method.
The way most stadiums are built are like you have said, steel structure 1. concrete terracing 2. roof erection 3. followed by cladding, then fitting the stadium out with changing rooms, toilets ect. Everything else follows, if you ever saw Beyern Munich's new stadium (which i did a presentation on for Uni) under construction you'll see they did the same as salfords, steel structure terrace and roof done all at the same time in a precast factory matufactured pod, then they followed it round the whole stadium in sections and by the time the stadium steel work was completed half the stadium already had seating fitted. Like i say different companys have different methods.
Another thing with the Reds stadium is its to be built in phase's the main west stand which is the one that you see up now is at its full phase the others are all at phase one, so in context the extra foundations that are there for the extentions in phase 2 will have to be buried. So its common sense really Buckinhams are getting the phase one build out the way then they'll concentrate on the other smaller phase 1 stands, which i can tell you will be started mid to late next week, and will take half the time of the west stand to erect and finish.
|
|
|
Rank | Posts | Team |
Player Coach | 411 | No Team Selected |
Joined | Service | Reputation |
Mar 2006 | 19 years | |
Online | Last Post | Last Page |
Jun 2021 | Aug 2020 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote ="Alexs Dad"Ooooh. Touchy. Are you one of these new fangled graduates who builds out of a book?
If we want to wave our construction cocks in the air then fine, lets get em out. I've been at it 22 years and worked on 3 stadia projects previously, tendered works on another couple and every one had the piling, groundworks, steel, terrace, cladding sequence following each other on each stand running consectivly and concurrently. We even had more than one big crane you know. Some of them had 2 or 3 100 tonne mobiles, on top of the boys toys and cherry pickers that get put away at night with Rolly Lofty and Scoop.
That stand looks like its steelwork is 95% complete, great progress. Whats the erectors doing now? Steel erectors don't want to be messing about with precast units, netting, and cladding. Yon mon before makes it sound like there's the same 6 blokes building the lot in sequence. You will know full well they fetch different subbies in for different tasks, the precast suppliers often carry out design and fix, the cladders are often different to the erectors, the netters will be someone else. Steel erectors want tonnage and the tonnage in that stand was completed weeks ago.
I'm sure if they tried they could build more than one at once, like Hull, Wire, Darlington, Shrewsbury, Leigh (I wont bore you why the Reebok had to be done like that)...especially as your groundworkers have been on there since December! 4 months later there is only steel in one of the stands. Thats 16 weeks. Hull was at PC within 48. When you're hammering it the groundworkers should be on GL20, erectors right up their backsides on GL15, precast on GL10, cladders on GL5, netters on 1.
If you can only build it one stand at once, fair enough, there may be good reason for it, but don't go all girly when someone points it out.'"
Smiffs?
|
|
|
Rank | Posts | Team |
Club Coach | 7152 | No Team Selected |
Joined | Service | Reputation |
Jan 2005 | 20 years | |
Online | Last Post | Last Page |
Dec 2020 | Jun 2020 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Don'tcha just love RL fans.
First we argue about whether moving would be a good idea. Then we argue about where it should be. Then we argue about how big it should be. Then we argue about whether it'll attract new fans. Then we argue about delays to the stadium. Then we argue about the webcam [size=85(probably)[/size.
Now we're bloody arguing about the methods of building the thing!
I couldn't care less. It's going up fairly quickly from what I can see and every time I drive past I get a warm glow that Salford will have a belting new home in full view of hundreds of thousands of drivers every day (and I'm a Wigan fan).
I'm sure whoever's building it - looks to be Buckingham Construction - [url=http://www.buckinghamgroup.co.uk/products.php?c=6 they seem to have a decent track record[/url - know what they're doing and as long as it's completed it time, that's all that matters.
|
|
|
Rank | Posts | Team |
Player Coach | 2464 | No Team Selected |
Joined | Service | Reputation |
Feb 2010 | 15 years | |
Online | Last Post | Last Page |
Oct 2011 | Jul 2011 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote ="Cronus"Don'tcha just love RL fans.
First we argue about whether moving would be a good idea. Then we argue about where it should be. Then we argue about how big it should be. Then we argue about whether it'll attract new fans. Then we argue about delays to the stadium. Then we argue about the webcam [size=85(probably)[/size.
Now we're bloody arguing about the methods of building the thing!'"
RLFans wouldn't be RLFans without pointless and illfounded arguments Cronus.
I'm surprised no one has tried to blame Agar for being singlehandedly responsible for the fact there is only steel in one of the stands (despite work starting in December) or Bath poaching Kyle Eastmond on the fact those steel erectors wont mess about with precast units, netting or cladding.
|
|
|
Rank | Posts | Team |
International Board Member | 2066 | No Team Selected |
Joined | Service | Reputation |
Feb 2003 | 22 years | |
Online | Last Post | Last Page |
Feb 2018 | Nov 2016 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote ="PHIPPS"RLFans wouldn't be RLFans without pointless and illfounded arguments Cronus.
I'm surprised no one has tried to blame Agar for being singlehandedly responsible for the fact there is only steel in one of the stands (despite work starting in December) or Bath poaching Kyle Eastmond on the fact those steel erectors wont mess about with precast units, netting or cladding.
'"
The non-existant construction problems are all Hull KR's fault, an FC fan told me so.
|
|
|
|
|