Quote ="cod'ead"Dredge?
Brough foreshore would require a damn sight more than simple dredging. Are you aware of just how much mud & silt is shifted down the Humber on each ebb tide? The cost of the operation would far outweigh the value of any turbines built there. It would probably be cheaper to relocate Saltend'"
I'm fully aware that it would be a bit more then simply dredging, and yes it would be an ongoing process. I was merely pointing out that it isn't an impossible task though, and once the initial dredging had been completed it would only require the channels to be kept clear.
Agreed though, it makes much more sense to have it further up the river as originally suggested. Then the the ships doing the offshore installation can load the turbine parts from a deepwater berth and out to the worksite all in one go, rather then having a barge loaded up and towed up to the ships to unload etc.