|
|
Rank | Posts | Team |
International Star | 2959 | No Team Selected |
Joined | Service | Reputation |
Jun 2015 | 10 years | |
Online | Last Post | Last Page |
Jan 2025 | Dec 2024 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Been down to the ground this afternoon. The north-west corner in front of the tea hut and old big screen is almost unrecognisable. A great proportion of the terracing in front of the north stand has been excavated leaving a large exposed crater.
|
|
|
Rank | Posts | Team |
International Board Member | 4958 | No Team Selected |
Joined | Service | Reputation |
Jan 2003 | 22 years | |
Online | Last Post | Last Page |
Jan 2025 | Jan 2025 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| [quote="Trojan Horse":rv133jhg]Had a Quick Look yesterday and looks like the 2024 team banner is still up covering west. Hopefully this gets sorted in time for SL starting. Be better to remove it than have an outdated team on it.
I’m sure it will be swapped over.[/quote:rv133jhg]
At the supporters night I think they said it would remain until the terrace gets planning permission and and developed.
|
|
|
|
Rank | Posts | Team |
Player Coach | 6301 | No Team Selected |
Joined | Service | Reputation |
Jan 2007 | 18 years | |
Online | Last Post | Last Page |
Jan 2025 | Jan 2025 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| [quote="Trojan Horse":3qt4fryg]Had a Quick Look yesterday and looks like the 2024 team banner is still up covering west. Hopefully this gets sorted in time for SL starting. Be better to remove it than have an outdated team on it.
I’m sure it will be swapped over.[/quote:3qt4fryg]
Judge your current status based on the things that irk you. We used to worry about the elephants. Now we just worry about the mice. I'll take that.
|
|
|
Rank | Posts | Team |
Moderator | 21212 | No Team Selected |
Joined | Service | Reputation |
Oct 2008 | 16 years | |
Online | Last Post | Last Page |
Jan 2025 | Jan 2025 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
Moderator
|
| I wouldn't take it down. Hides a very bad view.
Changing the photos I'm sure would be better though.
|
|
|
Rank | Posts | Team |
Fringe Player | 845 | No Team Selected |
Joined | Service | Reputation |
Jan 2022 | 3 years | |
Online | Last Post | Last Page |
Jan 2025 | Jan 2025 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
|
https://planning.wakefield.gov.uk/onlin ... JYGQQJOD00
looking at the planning portal for the west stand roofing etc ... there are some interesting dates shown... including a determination date of 15th Jan... which(I think) means a decision should have been made and we are waiting for formal approval/declination to be announced/ ratified
|
|
https://planning.wakefield.gov.uk/onlin ... JYGQQJOD00
looking at the planning portal for the west stand roofing etc ... there are some interesting dates shown... including a determination date of 15th Jan... which(I think) means a decision should have been made and we are waiting for formal approval/declination to be announced/ ratified
|
|
|
|
|
|
Rank | Posts | Team |
Club Captain | 2785 | No Team Selected |
Joined | Service | Reputation |
Jan 2019 | 6 years | |
Online | Last Post | Last Page |
Jan 2025 | Jan 2025 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| [quote="Spookisback":2abcex4y]https://planning.wakefield.gov.uk/online-applications/applicationDetails.do?activeTab=dates&keyVal=SN5JYGQQJOD00
looking at the planning portal for the west stand roofing etc ... there are some interesting dates shown... including a determination date of 15th Jan... which(I think) means a decision should have been made and we are waiting for formal approval/declination to be announced/ ratified[/quote:2abcex4y]
Had a Quick Look for meaning.
A determination date on a planning application is the date by which a local authority will decide whether to approve or refuse the application. The determination date is noted on the validation notice.
|
|
|
|
|