Quote ="upthetrin92":2ja2fiomI know the whole stand wont be ready for the 29th but it seems thqt only 3 sections need adding to the terrace and then I guess the backing would need sorting for the safety and the crush barriers installed, seems a lot to do as I type this out.
Just wasn't sure if there was plans to open the area in front of the screen'"
I don't know tbh as I say I'm guessing. I'd assume the barriers are straight forward, possibly with the fixings already in place. Looked to me like two sections to go. It's like a lot of things in construction, nothing seems to happen for an age then it all happens at once.
Can't see any reason why the front section couldn't be opened, although it won't get fully repaired and tidied until the upper section is complete.
But all speculation on my part.